Beyond our flagship projects, we deliver HVAC&R installations, replacements, and upgrades of every size across Georgia. Here are some recent examples.

Recent Works

The same standard on every job — large or small

Industrial chiller plant
Jul – Aug 2026

Hanwha Advanced Materials

Water chiller and DOAS leak repair, followed by an electrical-room AHU installation.

Rooftop unit replacement
Jun 2026

Daedong Hi-Lex — Cusseta, AL

Replacement of two 20-ton rooftop units (RTUs) — removal and refrigerant recovery, new curb adapter, ductwork and controls reconnection, start-up and commissioning.

Industrial plant refrigeration service
Mar – Apr 2026

Savannah LG Ensol — Savannah, GA

Refrigerant leak diagnosis and compressor replacement at the Savannah site.

S-JV battery cell plant
Oct 2025 – Jan 2026

S-JV Battery Cell Georgia Plant — Kingston, GA

Chiller maintenance through the autumn, then relocation and replacement of indoor cassette units — four removed, two reinstalled in the washing room, four new units added with full re-wiring and refrigerant piping.

Trane heat pump replacement
Nov 2025

Eastern Johns Creek Office — Johns Creek, GA

Trane 10-ton heat pump replacement — existing unit removed, refrigerant lines, wiring and condensate drain reconnected, start-up and safety verification completed.

Server-room refrigeration piping
Jul – Dec 2025

Savannah LG Ensol — Savannah, GA

Server-room ACR (refrigeration/HVAC) piping installation — 13,000+ ft total.

HVAC technician on site
Ongoing

Various small-scale works across Georgia

RTU & split replacements, refrigeration piping, control upgrades, and emergency repairs — handled with the same engineering standard, whatever the scale.

※ A representative selection — updated over time. More works can be added on request.